Harris Road Complete Street Feasibility Study

Share Harris Road Complete Street Feasibility Study on Facebook Share Harris Road Complete Street Feasibility Study on Twitter Share Harris Road Complete Street Feasibility Study on Linkedin Email Harris Road Complete Street Feasibility Study link

The City of Pitt Meadows is exploring ways to transform Harris Road into a "Complete Street" as recommended in the City’s 2023 Active Transportation Plan, prioritizing accessibility for all ages and abilities while balancing the needs of all road users, and considering the feasibility and associated costs.

A comprehensive audit of existing conditions was conducted to inform preliminary design concepts. The City assessed the feasibility and impacts to refine the designs to three potential AAA (All Ages and Abilities) options, incorporating cost estimates, design criteria, service impacts, and maintenance considerations. At a high level, designs are anticipated to incorporate:

  • Multi-use paths
  • Protected bike lanes
  • Wider sidewalks
  • Narrower vehicle lanes
  • Enhanced crossings
  • Improved lighting
  • Upgraded transit stops
  • Landscaping and tree modifications

The survey is now closed and the project team is compiling feedback received. Thank you!

The City of Pitt Meadows is exploring ways to transform Harris Road into a "Complete Street" as recommended in the City’s 2023 Active Transportation Plan, prioritizing accessibility for all ages and abilities while balancing the needs of all road users, and considering the feasibility and associated costs.

A comprehensive audit of existing conditions was conducted to inform preliminary design concepts. The City assessed the feasibility and impacts to refine the designs to three potential AAA (All Ages and Abilities) options, incorporating cost estimates, design criteria, service impacts, and maintenance considerations. At a high level, designs are anticipated to incorporate:

  • Multi-use paths
  • Protected bike lanes
  • Wider sidewalks
  • Narrower vehicle lanes
  • Enhanced crossings
  • Improved lighting
  • Upgraded transit stops
  • Landscaping and tree modifications

The survey is now closed and the project team is compiling feedback received. Thank you!

  • CLOSED: This survey has concluded.

    The City of Pitt Meadows is exploring ways to transform Harris Road into a "Complete Street" as recommended in the City’s 2023 Active Transportation Plan, prioritizing accessibility for all ages and abilities while balancing the needs of all road users, and considering the feasibility and associated costs.

    Why is this project important?

    Assessing the feasibility of a complete street is the next step towards enhancing active transportation in Pitt Meadows and informing future decision-making.

    Project Goals

    • Review options for implementing complete street elements into existing right-of-way
    • Develop high-level concept designs
    • Guide capital budget planning for potential future implementation
    • Understand maintenance requirements and associated service level

    This survey will take approximately 10 – 15 minutes to complete.

    If you are helping someone else complete this survey, please answer the questions on their behalf (i.e. as if you were that person).

    This collection of personal information is authorized under section 26(c) of the Freedom of Information & Protection of Privacy Act. The information will be used to inform the Complete Street Feasibility Study for the City of Pitt Meadows, or a use consistent with that purpose. Privacy questions can be directed to: Privacy Officer, 604.465.5454, or clerks@pittmeadows.ca

    This survey is being conducted by Aplin Martin and UPLIFT Engagement Communications Inc. on behalf of the City of Pitt Meadows. 

    Share Harris Road Complete Streets Feasibility Study Survey on Facebook Share Harris Road Complete Streets Feasibility Study Survey on Twitter Share Harris Road Complete Streets Feasibility Study Survey on Linkedin Email Harris Road Complete Streets Feasibility Study Survey link
Page last updated: 13 May 2025, 10:22 AM